Monday, October 20, 2014

Lights

The Most of the lights are in. Still have a lot of finishes that need to be done but we're hoping to be done in about 30 days.

We're having these barn doors installed between the great room and the music room.
They are almost finished with the deck.

Master bath
Master bathroom shower 
Upstairs kids bedroom fans installed 
Jack and Jill bathroom. The cabinet guy messed up and put the wrong finish on the upstairs cabinets so now he has to redo the fronts. He's not happy but the problem with most subcontractors is they are bad at documenting things so they screw up stuff.
They began tearing down the old chain link fence. We'll be putting in a retaining wall with a new fence.